Chapter 2 Installation Preparations
Confidential and Proprietary Information of ZTE CORPORATION 13
Unpacking Inspection
The ZTE Engineers must perform the unpacking inspection along
with operator’
with operator’
s side engineers.
1. Check whether the total pieces are correct, packages are in
good condition, and the destination location matches the
installation location. If the results are all normal, start
unpacking inspection.
installation location. If the results are all normal, start
unpacking inspection.
2. The equipment inspection list and unpacking inspection
report are contained in package #1. First open the #1
package and take out the Unpacking Inspection Report.
Check the total number of the goods against the inspection
list and record it for filing.
package and take out the Unpacking Inspection Report.
Check the total number of the goods against the inspection
list and record it for filing.
3. If any item is missing, lack, incorrect, excessive or damaged,
the reason must be found out, and the engineering
supervisor should fill in the Unpacking Inspection Feedback
Table, which must be fed back to ZTE in time for handling.
supervisor should fill in the Unpacking Inspection Feedback
Table, which must be fed back to ZTE in time for handling.
Note:
When the equipment is moved a hotter and damper place,
wait for 30 minutes before unpacking the equipment. Otherwise,
moisture may condense on the surface of the equipment and damage
the equipment as a result.
Wooden Case Unpacking Procedure
1. Insert the screwdriver or claw hammer into the tab hole on
the cover plate of the wooden case, and turn the tab straight;
2. Lift and remove the cover plate after all tabs have been
turned straight;
3. Turn straight the tabs of the plates on four sides of the
wooden boxes, and remove the plates.