FMC Corporation - Talstar FMC L06 Manuale Utente

Pagina di 65
Doc No: OMM50000903 
Rev:  B  Page 17 of 65 
Subject to contractual terms and conditions to the contrary, this document and all the information contained herein are the confidential and exclusive  
property of FMC Technologies, and may not be reproduced, disclosed, or made public in any manner prior to express written authorization by FMC. 
7.0 
Inspection and Preventative Maintenance Chart 
 
Routine maintenance is an essential part of any successful pump installation.  Properly 
maintained FMC pumps are designed to offer years of trouble-free service. 
Regular maintenance and inspection will keep your pump operating at peak 
performance.  FMC pumps have been carefully engineered to minimize maintenance 
requirements and simplify these tasks when they are required.  Regular inspections 
allow operators to become familiar with normal pump operation so they can recognize 
the signals of potential problems and schedule maintenance.  The maintenance chart in 
Table 3 shown below should be used as a guideline only.  Many applications will require 
adjustment of the intervals shown in this chart for severe or unusual operating 
conditions. 
 
 
Interval 
Component 
Service 
Remarks 
Break In 
Crankcase Oil 
Change 
Drain and refill with new oil after first 50 hours of operation.  Insure 
that the magnetic drain plugs are cleaned to remove debris. 
Period 
Inlet Strainer 
Inspect 
Clean if Required.  The amount of material in the strainer will 
determine the interval of cleaning. 
  
Complete Pump 
Inspect 
General inspection of pump and system to check for proper operation 
of equipment. 
Daily 
Piston cup sets 
Inspect 
Check the cylinder liner area of the pump for signs of leakage.  
Replace piston cups if leakage becomes excessive. 
  
Pump System 
Flush 
Required for shutdown when pumping fluids that may harden or 
corrode the pump if left inside once stopped. 
  
Crankcase Oil 
Inspect 
Insure that the oil is at proper level and has not been contaminated by 
pumpage or condensation. 
  
Crankcase Oil 
Change 
Drain and refill with new oil.  Clean magnetic drain plugs. 
3 Months/ 
Stuffing Box Bolts 
Inspect 
Check the stuffing box bolts with a torque wrench to insure they are 
within specification. 
2,000 hours 
Connecting Rod 
Bolts 
Inspect 
Check the connecting rod bolts with a torque wrench to insure they 
are within specification.  This should be done in conjunction with oil 
change. 
 
Table 3: Maintenance Chart