Honeywell HC900 ユーザーズマニュアル
I/O Module Installation and Wiring - I/O Installation Procedures
Revision 5
HC900 Hybrid Controller Installation and User Guide
67
9/03
Step Procedure
Comments
Reference
7
Connect wire shield to
grounding bars on top
and/or bottom of the Rack.
grounding bars on top
and/or bottom of the Rack.
(Refer to Signal
Grounding, at the
beginning of this section,
for suggestions and
recommendations.)
Grounding, at the
beginning of this section,
for suggestions and
recommendations.)
8
Install I/O modules in
racks.
racks.
9
In each slot location not
occupied by an I/O
module, install a Filler
Block cover, Part number
900TNF-0001.
occupied by an I/O
module, install a Filler
Block cover, Part number
900TNF-0001.
Note:
The Filler Block Cover looks much like an I/O Terminal
Block assembly, except that it does not include the wire
terminating block (screw terminals). The Filler Block mounts in
the same manner as a Terminal Block (with captured screws at
top and bottom). Blank labels are provided for mounting in the
hinged door.
terminating block (screw terminals). The Filler Block mounts in
the same manner as a Terminal Block (with captured screws at
top and bottom). Blank labels are provided for mounting in the
hinged door.