Lucent Technologies lucent ユーザーズマニュアル
DEFINITY Enterprise Communications Server Release 6
Maintenance for R6vs/si
Maintenance for R6vs/si
555-230-127
Issue 1
August 1997
Maintenance Object Repair Procedures
Page 10-174
BRI-PORT (ISDN-BRI Port), ABRI-PORT (ASAI ISDN-BRI Port)
10
Layer 1 Transmission Error Counter Test (#624)
This test reads and clears the BRI port’s Layer 1 Transmission error counter
maintained on the BRI-LINE circuit pack. This counter is incremented by the
circuit pack when it detects a Layer 1 transmission problem. The test passes if
the value of the counter is 0 (that is, the error is cleared). If the counter is not
zero, the test fails, and the value of the counter is displayed in the Error Code
field.
maintained on the BRI-LINE circuit pack. This counter is incremented by the
circuit pack when it detects a Layer 1 transmission problem. The test passes if
the value of the counter is 0 (that is, the error is cleared). If the counter is not
zero, the test fails, and the value of the counter is displayed in the Error Code
field.
This error is most likely due to a problem with the wiring or the endpoint or
adjunct (verify that the wiring meets the configuration rules defined in
adjunct (verify that the wiring meets the configuration rules defined in
DEFINITY
Communications System Generic 1 and Generic 3i Wiring
, 555-204-111). It does
2012
ABORT
Internal System Error.
2100
ABORT
Could not allocate the necessary system resources to run this test.
1. Retry the command at one-minute intervals a maximum of five
times.
2. If the test continues to abort, escalate the problem.
1
FAIL
The BRI-LINE circuit pack reports that it has detected an overcurrent
condition and has turned off the EPF.
condition and has turned off the EPF.
1. As necessary, check and repair the wiring between the circuit pack
and the endpoint or adjunct. Check the endpoints and replace one
or both sets if the sets are drawing too much current. Execute the
or both sets if the sets are drawing too much current. Execute the
test port PCSSpp
command and review the results of the EPF
Inquiry Test to verify the repair. If this test is still failing, proceed to
Step 2.
Step 2.
2. Execute the
test port PCSSpp
command, and review the results of
the Level 1 Status Inquiry Test. If this test is also failing, then follow
the repair procedure for the Level 1 Status Inquiry Test. Otherwise,
escalate this problem to the next tier.
the repair procedure for the Level 1 Status Inquiry Test. Otherwise,
escalate this problem to the next tier.
PASS
The Electronic Power Feed Inquiry Test reports that the EPF is on.
2000
ABORT
Response to the test was not received from the circuit pack within the
allowable time period.
allowable time period.
1. If the test aborts repeatedly a maximum of five times, reset the
circuit pack via the
busyout board PCSS
and
reset board PCSS
commands.
2. If the test aborts again, replace the circuit pack.
2012
ABORT
Internal System Error.
Table 10-61.
TEST #622 Electronic Power Feed Inquiry —
Continued
Error
Code
Code
Test
Result
Description/ Recommendation
Continued on next page