Briggs & Stratton 5900834 ユーザーズマニュアル

ページ / 56
44
www.ferrisindustries.com
Installing the Operator Compartment 
Assembly
 1.  Park the machine on a flat, level surface such as 
a concrete floor.  Disengage the PTO, engage the 
parking brake, turn off the engine, and remove the 
ignition key.
 2.  Place the operator compartment assembly (C, 
Figure 62) on the unit and loosely install the two 
(2) 1/2” bolts and washers (A & B) through the 
spacers (D) in the rubber pivot mounts (E) and into 
operator compartment front pivots.
 3.  Install the shock (B, Figure 63) to the bottom 
shock mount (C) and secure in place using the 3/8 
X 2-1/2” bolt, 3/8 washer and 3/8-16 nylock flange 
nut (A).
 4.  Install the eyebolt (C, Figure 60) to the ground 
speed control lever arm (A) and secure using the 
eyebolt hardware (B).  The eyebolt should be on 
the inside edge of the ground speed control lever 
arm tab and the hardware should be routed so it 
faces towards the center of the unit.
 5.  Install the cable plates (E, Figure 59) to the 
operator compartment and secure using the four 
(4) 1/4 bolts (C) and washers (D).
 6.  Install the top motion control guard (B) onto the 
unit and secure in place using the two (2) allen 
head bolts (A).
 7.  Connect the wire harness by pushing the 
instrument panel wire harness connector (A, 
Figure 61
) into the main unit wire harness 
connector (B).
 8.  Install the choke and throttle cable plate (B, 
Figure 58) into the instrument panel and secure 
using the four (4) allen head screws (A).
 9.  Position the left fuel tank (A, Figure 56) onto the 
machine and secure in place using the three (3) 
bolts, lock washers and washers (B).
 10. Install the right tank (A, Figure 57) on the machine 
and secure in place using the three (3) wing bolts 
(B).
Regular Maintenance
Not 
for  
Reproduction