4. MULTIPLE VENT TABLE
Table  5  on  page  17  has  been  compiled  to  show  the  material 
sizes  in  a  Type  B  doublewall  combined  vent  system.  Refer  to  
CAN/CSA B149 .1 (current edition), or the ASHRAE 1983 Equipment 
Volume for further information.
A combined vent system is one in which two or more boilers at one 
level are attached to a common vent.
In order to use table 5, the connector rise and total vent height must 
be known. Connector rise is vertical distance from the draft hood outlet 
to the point where the manifold connection is made. Total vent height 
is the least vertical distance from a draft hood outlet to the top of the 
vent. Local codes or utility requirements often govern termination 
height. ULC listed doublewall gas vents, up through 24" (610mm) 
diameter, can be installed in heated and unheated areas and can 
pass through floors, ceilings, partitions, walls and roofs, provided 
the required one inch clearance is observed. These vents should be 
installed in accordance with CAN/CSA B149.1 (current edition).
EXAMPLE SHOWING USE OF THE HW-610 COMBINED VENT 
SIZING TABLE
FIGURE 9.
VENTING MAINTENANCE - STANDARD VENTING
It  is  recommended  that  the  heating  surfaces  and  vent  piping  of 
the appliance be checked every six months for dust, deterioration 
and carbon deposits.  Remove all soot or other obstructions from 
chimney and flue which will retard free draft.  Replace any damaged 
or deteriorated parts of the venting system.
Qualified servicers should follow this procedure when the boiler’s 
external heating surfaces and vent pipe need cleaning.
 CAUTION
DO NOT USE A NYLON BRUSH OR OTHER STATIC CREATING 
MATERIAL TO CLEAN DUST AND CARBON DEPOSITS FROM 
HEATING SURFACES AND VENT.
SUCH DEPOSITS ARE FLAMMABLE AND MAY BE IGNITED BY 
STATIC ELECTRICITY.  USE A METAL BRUSH TO MINIMIZE THE 
DANGER OF EXPLOSION.
1.  Turn off the electrical power (main manual gas shutoff and pilot 
valves, if applicable).
  Allow boiler parts and vent to cool before disassembly.
2.  Remove the boiler draft diverter and vent pipe running to the chimney.
  •  Check parts and chimney for obstructions and clean as necessary.
3.  Remove burner from boiler and other metal parts as required to 
clean and vacuum the heat exchanger and combustion coils.
  •   Refer to parts list supplied with this manual for disassembly aid.
4.  Reinstall the parts removed in steps 2 and 3.
  •  Be sure the vent pipe has a minimum upward pitch of one quarter 
inch per foot of length (21mm/m) and is sealed as necessary.
5.  Restore electrical power and gas supply to boiler.
  •  Place boiler in operation by following the lighting instructions 
in this manual.
  •  Check for gas leaks and proper boiler and vent operation.
VENTING - SIDEWALL (OPTIONAL) POWER VENT SYSTEM
If  you  are  installing  the  optional  Power  Vent  Kit,  refer  to  your  
HW  Power  Vent  Kit  Installation  Instructions  for  proper  wiring 
and  installation  procedures.  Contact  your  local  A.  O.  Smith 
representative for details.
VENTING SYSTEM
HAVE VENTING SYSTEM CHECKED EVERY SIX MONTHS FOR 
OBSTRUCTIONS AND/OR DETERIORATION IN VENT PIPING.
A.  Insofar as is practical, close all doors, windows and air inlets to 
the building.  Turn on all exhaust fans (range hood, bathroom 
exhaust,  etc.)  so  they  will  operate  at  their  maximum  speed.  
Close fireplace dampers.
B.  After  allowing  appliance  to  operate  for  five  minutes,  test  for 
spillage at the draft hood relief opening.
C.  “CHECKING THE DRAFT. Operate vent connected gas utilization 
equipment for several minutes and check to see that the combustion 
products are going up the chimney or gas vent properly by passing 
a lighted match or taper around the edge of the relief opening of 
the draft hood. If the chimney or gas vent is drawing properly, the 
match flame will be drawn into the draft hood. If not, the combustion 
products will tend to extinguish this flame. IF THE COMBUSTION 
PRODUCTS ARE ESCAPING FROM THE RELIEF OPENING OF 
THE DRAFT HOOD, DO NOT OPERATE THE EQUIPMENT UNTIL 
PROPER ADJUSTMENT OR REPAIRS ARE MADE TO PROVIDE 
ADEQUATE DRAFT THROUGH THE CHIMNEY OR GAS VENT.”
D.  Next, turn on all other fuel burning appliances within the same 
room so they will operate at their full input.
 
Repeat step C above, checking the draft on each appliance.
FIGURE 10.