Cisco Cisco SG200-26P 26-port Gigabit PoE Smart Switch インストールガイド

ページ / 12
Cisco 200 Series Smart Switches
3
• Circuit Overloading—Adding the device to the power outlet must not 
overload that circuit.
Rack-Mount Placement
S
TEP
1
Remove the four screws from each side near the front of the switch. 
Retain the screws for re-installation. (Do not remove the four screws 
from each side near the back of the switch.)
S
TEP
2
Place one of the supplied spacers on the side of the switch so the 
four holes of the spacers align to the screw holes. Place a rack 
mount bracket next to the spacer and reinstall the four screws 
removed in 
Step 1
.
N
OTE
If your screws are not long enough to reattach the bracket 
with the spacer in place, attach the bracket directly to the case 
without the spacer.
S
TEP
3
Repeat 
Step 2
 for the other side of the switch.
S
TEP
4
After the mounting hardware has been securely attached, the 
switch is now ready to be installed into a standard 19-inch rack.
C
AUTION
For stability, load the rack from the bottom to the top, with the 
heaviest devices on the bottom. A top-heavy rack is likely to 
be unstable and might tip over.
181185