HP ProLiant ML330 G6 ユーザーズマニュアル

ページ / 129
 
Hardware options installation 69 
7. 
Connect the cable to the cache module. 
 
8. 
Install the battery pack. 
 
9. 
Route the cable. 
10. 
11. 
Do one of the following: 
Close or install the tower bezel, as needed. 
Slide the server back into the rack. 
12. 
Power up the server (on page 
 
SAS controller option 
To install the component: 
1. 
Power down the server (on page 
2. 
Do one of the following: 
Open or remove the tower bezel, as needed ("
).