Norsat International Inc. NSLK3200 ユーザーズマニュアル
Page 32
Norsat NewsLink
099-20003-01OM
Norsat
FIGURE 25.
LNB Cable Connection on LNB.
3.
Secure cable to the feed assembly with nylon clips.
4.
Secure cable to the boom arm with nylon clips.
Level Antenna Base
1.
Using the knobs on each foot, adjust the height of the support legs until
the bubble of the level indicator is centered in the target; refer to
Figure 26 on page 32.
the bubble of the level indicator is centered in the target; refer to
Figure 26 on page 32.
2.
Telescopic Legs (optional): adjust the length of the length of the support
legs until the bubble of the level indicator is centered in the target; refer to
Figure 26 on page 32.
legs until the bubble of the level indicator is centered in the target; refer to
Figure 26 on page 32.
FIGURE 26.
Adjust the Height of Leg and Adjust the Length of the Leg (optional).
Deploying the Baseband/IF Unit
The following steps describe the procedure for opening the Baseband/IF unit
case.
case.