Nokia Solutions and Networks T4KJ1 ユーザーズマニュアル

ページ / 157
Installation of the BCUII
Chapter 4: Installation of the indoor portions of the Remote RF based eNodeB
Installation of the BCUII
The Installation of the BCUII section provides general information and procedures for installing
a Base Control Unit II (BCUII).
BCUII is designed as an indoor component that can be mounted on a standard 19-inch rack.
shows the BCUII.
Figure 4-1
BCUII physical design
ti-cdma-05694.eps
Required materials and tools
The following materials and tools are required:
BCUII SG1756
T15 driver
Customer supplied ground cable, length determined by distance from the unit to the
master ground.
Wire stripper/cutters.
Digital Multi-Meter (DMM) Fluke Model 8062A with Y8134 test lead kit or equivalent; used
for precision DC and AC measurements, requiring 4-1/2 digits.
4-2
68P09308A55-6
FEB 2010