Wi Lan Inc EB04 ユーザーズマニュアル

ページ / 207
4 Bench Test Units
APR 2002 Rev 03
21
Basic Test  Setup
4.
Power up the base station. The power LED on the Power Inserter Unit should be GREEN.
5.
Power up the remote unit. The power LED on the Power Inserter Unit should be GREEN.
Next, you will test the link with the Link Monitor test and adjust the Tx power level to obtain a fade margin
of 15–30 dB.
2 m
minimum
Base Unit
Remote Unit
Indoor
Antenna
Indoor
Antenna
Coax Adapter Cable
Coax Adapter Cable