VeriFone 1619-20XPL ユーザーズマニュアル

ページ / 37
 
 
CONFIDENTIAL 
Version A 
Page 29 of 37 
MasterCard® PayPass™ Contactless Transit Pilots 
Installation Guide 
 
4
 
New Jersey PATH Rail Installation 
This procedure defines how to perform an installation of the phase 2 solution into a NJ PATH 
Rail subway turnstile and CAM.  
4.1
 
Background 
For  NJ  PATH  Rail  installations,  the  solution  is  to  be  fitted  within  a  cabinet,  the  CAM, 
which  stands  adjacent  to  the  turnstile.  The  contactless  reader  card  reader  shall  be 
fitted on exterior of the CAM and the Secura Control Unit shall be fitted on an available 
shelf  within  the  CAM.  The  Secura  will  be  attached  via  the  solenoid  cable  to  the 
turnstile’s  release  mechanism.  The  duration  of  the  solenoid  pulse  which  releases  the 
turnstile needs to be calibrated during the installation process. 
4.2
 
What is Supplied? 
The NJ PATH Rail part number is: PPCR002
It comprises: 
1.
 
Contactless Reader Assembly 
2.
 
Secura Control Unit Assembly 
3.
 
Power cable, 08826-02-R 
4.
 
Mains cable, 08839-01-R 
5.
 
Solenoid Cable, 08827-02-R 
6.
 
OTI Contactless Reader Cable, 08829-01-R 
7.
 
LED Board Cable, 08828-01-R 
8.
 
LAN Cable, 08836-01-R 
Note that where possible, cables will be pre-fitted to the assemblies 
4.3
 
Tools Required 
The following tools are required to install the VeriFone-supplied equipment for the pilot 
installations. 
o
 
5mm Allen Key 
o
 
4.0, 5.5, 7.0 and 8.0 AF Nut Spanners 
o
 
T25 and T30 Torx Drivers 
4.4
 
Installation Pre-requisites 
1.
 
An  ethernet  cable  has  been  run  into  the  CAM,  terminated  with  a  female  RJ45 
connection point. 
2.
 
A 3-Pin (110v) power socket has been run into the turnstile. 
3.
 
The Secura is pre-loaded with the application software. 
4.
 
A cable has been pre-fitted to the turnstile release mechanism. 
5.
 
Any existing unused electronics  have been re4moved from the CAM, i.e. the shelf is 
free for the Secura Control Unit to be installed.