Page  30 
5.0  MAINTENANCE 
 
5.1
  
M
AINTENANCE AND 
I
NSPECTION 
S
CHEDULE
 
 
 
WARNING!  
Label all wires prior to disconnection when 
servicing controls.  Wiring errors can cause 
improper and dangerous operation. 
 
 
WARNING! 
Use care when reassembling main gas line to 
assure all connections are tight. 
 
 
WARNING! 
Use care when servicing boiler in order to prevent 
the accumulation of gas in or around the 
combustion chamber. 
 
WARNING! 
General lockout/ tagout procedure must be 
employed when servicing this unit. 
 
WARNING! 
Determine the cause of the lockout before 
resetting the boiler.  If able to determine cause of 
lockout, then appropriate corrective action should 
be taken.  If not able to determine cause of the 
problem, call a qualified service technician. 
 
Verify proper operation after servicing. 
 
5.1.1  Daily 
Observe operating temperature and general conditions.  
Make sure that the flow of combustion and ventilating 
air to the boiler is not obstructed.  Determine the cause 
of any service codes or lockouts on the display panel.  
Observe any unusual noises or operating conditions 
and make the necessary corrections.  Notify 
responsible individuals for required corrective action 
or repair. 
 
WARNING!  
Check daily to be sure that the boiler area is free 
and clear of any combustible materials, including 
flammable vapors and liquids. 
 
5.1.2  Weekly 
Observe the conditions of the main flame.  A normal 
high fire flame is blue.  If the high fire flame is yellow 
then corrective action must be taken.  In normal low 
fire the burner will glow a yellowish-orange. 
Correct air adjustment is essential to the efficient 
operation of this boiler.  If an adjustment in the 
combustion is necessary, the flue gas composition 
should be checked with a carbon dioxide (CO
2
) or 
oxygen (O
2
) analyzer to set conditions.  Refer to Table 
3-1, Section 3.12.4 for proper combustion readings. 
 
5.1.3  Monthly (During Operation) 
1.  Test flame detection by voltage reading at the 
terminal strip (Terminal 9 on TB-1 and ground 
screw).  The voltage reading should be between (5 
and 10 VDC). 
2.  Test high-limit Control.  Refer to Section 3.11.3. 
3.  Test operating temperature controls by reducing or 
increasing temperature setting as necessary to 
check burner operation. 
4.  Test the low water level cut-out.  Refer to Section 
3.11.2. 
5.  Test low gas pressure switch.  Refer to Section 
3.11.4. 
6.  Check the condensate drain system.  Clean and 
flush as necessary.   
Installation and service must be performed by a 