Teledyne Model Vehicle T400 ユーザーズマニュアル

ページ / 396
T400 Ozone Analyzer Operator’s Manual 
Troubleshooting & Service 
 
271 
12.10.3. REPLACING THE IZS O
3
 SCRUBBER 
1.  Turn off power to the instrument. 
2.  Remove instrument cover. 
3.  The IZS zero air scrubber is attached to the brass elbow inlet fitting on the top of the 
O
3
4.  Disconnect 1/4” Tube Fitting nut on O
3
 generator inlet fitting. 
5.  Disconnect 1/8” tube fitting on the other end of the scrubber. 
6.  Install new scrubber by reversing these steps. 
I Z S   Z E R O   A I R
S C R U B B E R  
 
Figure 12-6: 
IZS O
3
 Generator Zero Air Scrubber Location 
12.10.4. METAL WOOL SCRUBBER OPTION 
Contact TAPI for instructions on replacing the optional Metal Wool Scrubber. 
12.10.5. DISK-ON-MODULE REPLACEMENT PROCEDURE 
 
CAUTION 
Servicing of circuit components requires electrostatic discharge protection, i.e. ESD 
grounding straps, mats and containers.  Failure to use ESD protection when working 
with electronic assemblies will void the instrument warranty.  Refer to Section 13 for 
more information on preventing ESD damage. 
 
Replacing the Disk-on-Module (DOM) will cause loss of all DAS data; it may also 
cause loss of some instrument configuration parameters unless the replacement DOM 
carries the exact same firmware version. Whenever changing the version of installed 
software, the memory must be reset. Failure to ensure that memory is reset can cause the 
06870C DCN6332