Technicolor - Thomson Electronic Accessory Gecko Frames Signal Processing System ユーザーズマニュアル

ページ / 52
Gecko Frames Instruction Manual
25
 
Section
 2
Installation
Introduction
This section contains information about:
Rack mounting the frame,
Module installation,
Rear connectors, and
Frame Alarm.
Rack Mounting the Frame
After carefully unpacking this equipment, check the box for a power cords 
and other hardware, and examine the equipment for damage. Any damage 
should be promptly reported to the carrier.
The frame is designed to mount in a standard 19-inch equipment rack. 
Mounting space of 3.5 inches (89 mm) vertically and mounting depth of 14 
inches (356 mm) are required. Mount the frame in a standard 19-inch rack 
using customer-supplied rack mounting screws.
CAUTION Before lifting the frame, verify that the power supplies are fully seated in their 
slots. Front ejector tabs should click into place when snapped on the locking 
pin on the module (see 
).
Figure 7.  Power Supply Ejector Tab Locking Pin
0636 -13
Ejector
tab
lock pin