Cabletron Systems NBR-420 사용자 설명서

다운로드
페이지 73
Preparing the NBR for Installation
NBR-SERIES Installation Guide
Page 3-11
3.2.7 Testing the NBR
Before installing the NBR in a live network, test the hub in a controlled 
situation to ensure that it is bridging packets. Perform this test with two 
workstations (see Figure 3-6), as follows:
1. Connect the first workstation to an NBR EPIM or BRIM.
2. Connect the second workstation to an NBR EPIM or BRIM.
3. Assign a valid IP address to the NBR using Local Management.
4. Designate the first workstation as a file server and the second one as 
the client. Refer to the workstation manuals for establishing one as a 
file server and one as a client. 
5. Send packets between the two workstations to verify the proper 
operation of the NBR.
NOTE
A “ping” test of the other workstation verifies the NBR is 
operating properly.