Netgear GSM712 사용자 설명서
Page 13 of 24
CHAPTER 3: INSTALLATION
This chapter describes the installation procedures for your NETGEAR Model GSM712/GSM712F Managed
Gigabit Switch. Switch installation involves the following steps:
Gigabit Switch. Switch installation involves the following steps:
Step 1: Preparing the site
Step 2: Installing the switch
Step 3: Installing a GBIC module
Step 4: Checking the installation
Step 5: Applying AC power
Step 6: Connecting to the console port to manage the switch (initial configuration)
Step 7: Connecting devices to the switch
Step 1: Preparing the Site
Before you install your switch, be sure your operating environment meets the operating environment
requirements in Table 3-1.
requirements in Table 3-1.
Table 3-1. Site Requirements
Characteristics
Requirements
Mounting
Desktop installations:
Rack-mount installations:
Provide a flat table or shelf surface.
Use a 19-inch (48.3-centimeter) EIA standard equipment rack that is grounded and physically
secure. You also need the rack-mount kit supplied with your switch.
Use a 19-inch (48.3-centimeter) EIA standard equipment rack that is grounded and physically
secure. You also need the rack-mount kit supplied with your switch.
Access
Locate the switch in a position that lets you access the front panel RJ-45 ports, view the front
panel LEDs and power connector.
panel LEDs and power connector.
Power source
Provide a power source within 6 feet (1.8 meters) of the installation location. Power specifications
for the switch are shown in Appendix C. Be sure the AC outlet is not controlled by a wall switch,
which can accidentally turn off power to the outlet and the switch.
for the switch are shown in Appendix C. Be sure the AC outlet is not controlled by a wall switch,
which can accidentally turn off power to the outlet and the switch.
Environmental
Temperature:
Install the switch in a dry area, with ambient temperature between 0 and 40ºC (32 and 104ºF).
Keep the switch away from heat sources such as direct sunlight, warm air exhausts, hot-air vents,
and heaters.
Keep the switch away from heat sources such as direct sunlight, warm air exhausts, hot-air vents,
and heaters.
Operating humidity:
The installation location should have a maximum relative humidity of 90%, non-condensing.
Ventilation:
Do not restrict airflow by covering or obstructing air inlets on the sides of the switch. Keep at least
2 inches (5.08 centimeters) free on all sides for cooling.
Be sure there is adequate airflow in the room or wiring closet where you intend to install the
switch.
2 inches (5.08 centimeters) free on all sides for cooling.
Be sure there is adequate airflow in the room or wiring closet where you intend to install the
switch.
Operating conditions:
Keep the switch at least 6 ft (1.83 m) away from nearest source of electromagnetic noise, such as
a photocopy machine.
a photocopy machine.
Step 2: Installing the Switch
You can install your NETGEAR Model GSM712/GSM712F Managed Gigabit Switch on a flat surface or in
a standard 19-inch rack.
Installing the Switch on a Flat Surface
The switch ships with four self-adhesive rubber footpads. Stick one rubber foot pad on each of the four
concave spaces on the bottom of the switch. The rubber footpads cushion the switch against
shock/vibrations.
a standard 19-inch rack.
Installing the Switch on a Flat Surface
The switch ships with four self-adhesive rubber footpads. Stick one rubber foot pad on each of the four
concave spaces on the bottom of the switch. The rubber footpads cushion the switch against
shock/vibrations.