Figure 3-2.  Installing a Gigabit Ethernet Module 
 
 
 
Figure 3-3.  Installing a Gigabit Ethernet Module 
 
Step 4: Checking the Installation 
Before you apply power: 
 
o
  Inspect the equipment thoroughly.  
o
  Verify that all cables are installed correctly.  
o
  Check cable routing to make sure cables are not damaged or are a safety hazard.  
o
  Be sure all equipment is mounted properly and securely.  
 
Step 5: Applying AC Power 
NETGEAR Model GSM712/GSM712F Managed Gigabit Switches do not have an ON/OFF switch; the only 
method of applying or removing AC power is by connecting or disconnecting the power cord. Before you 
connect the power cord, select an AC outlet that is not controlled by a wall switch, which can turn off power 
to the switch. After you select an appropriate outlet, use the following procedure to apply AC power.