Netgear GS510TP-100NAS 사용자 설명서

다운로드
페이지 32
Note:  
The PoE port may be considered SELV circuits, if it 
is not likely to require connection to an Ethernet 
network with outside plant routing, including campus 
environment; and the installation instructions clearly 
state that the ITE is to be connected only to 
PoEnetworks without routing to the outside plant.
Installation
22
NETGEAR GS510TP Smart Switch 
Step 5: Applying AC Power
Before connecting the power cord, select an AC outlet that is not controlled by a wall switch, 
which can turn off power to the switch. After selecting an appropriate outlet, use the following 
procedure to apply AC power:
1. 
Connect the end of the supplied AC power cord to the power receptacle on the back of 
the switch.
2. 
Connect the AC power cord into a power source such as a wall socket or power strip.
When applying power, the Power LED on the switch’s front panel illuminates.
If the Power LED does not go on, check that the power cord is plugged in correctly and that 
the power source is good. If this does not resolve the problem, refer to 
Step 6: Managing the Switch using a Web Browser or the 
PC Utility
The GS510TP Smart Switch contains software for viewing, changing, and monitoring the way 
it works. This management software is not required for the switch to work. The ports can be 
used without using the management software. However, the management software enables 
the setup of VLAN and Trunking features and also improves the efficiency of the switch, 
which results in the improvement of its overall performance as well as the performance of the 
network. 
After powering up the switch for the first time, the Smart Switch can be configured using a 
Web browser or a program called Smart Control Center Utility. For more information about 
managing the switch, see the Gigabit Advanced Smart Switch Series Software Administration 
Manual 
on the Smart Switch Resource CD.