A hearth is not mandatory but is recommended for  
aesthetic purposes. We recommend a noncombustible 
hearth which projects out 12” (305 mm) or more from 
the front of the fireplace. The hearth cannot exceed 1¹⁄₂” 
(38mm) in height from bottom of fireplace for ease of 
door accessibility. (Fig. 5)
Cold climate installation recommendation:  
When installing this unit against a non-
insulated exterior wall or chase, it is 
mandatory the outer walls be insulated to 
conform to applicable insulation codes.  
If a vapor barrier is used it can not come into 
contact with fireplace.
Hearth
Framing and Finishing
1.  Choose the unit location.
2.  The unit is shipped with four (4) nailing flanges 
mounted to the sides near the front corners. (Fig. 5)
3.  Frame the fireplace with a header across the top of 
the standoff. (Fig. 6) It is very important to allow for 
the finished wall face along with marble, tiles or any 
other noncombustible face finish material desired 
when setting the depth of the framing.
Final Finishing
Noncombustible materials such as brick or tile may be 
brought to the edges of the face of the appliance. 
Fig. 6   Fireplace framing.
FP1560
3"
(76mm)
3"
(76mm)
FP1560
DVT44
framing
3/05   djt
4.  Attach the fireplace nailing flanges to the frame as 
shown in Figure 5.
5.  The gas components are located in the control panel 
assembly attached to the right side of the unit. (Fig. 
5) 
6.  The U-channel located on the top of the unit as well 
as the nailing flanges on the sides that were men-
tioned in Step 1, are designed to accommodate non-
combustible board (recommended Dura-Rock). They 
are positioned 1” (25mm) back from the face of the 
unit. NOTE: The U-channel depth can be adjusted 
by loosening the hex nut inside the channel.
  If marble, tile or any other noncombustible decora-
tive face finish material is desired, a 3” (76 mm) wide 
noncombustible board (recommended Dura-Rock) 
is to be nailed to the nailing flanges on both sides 
of the unit. Also, 12” (305 mm) of  noncombustible 
board is to be nailed to the front face of the U-chan-
nel and the top framing member above the standoff. 
  Combustible material can then be brought to the 
outside edges of the noncombustible board installed 
earlier. Any noncombustible decorative face finish 
could be brought to the sides and top of the unit and 
can cover the framing and sheet rock. If a decora-
tive facing is not desired, then the noncombustible 
boards must be double thickness and brought flush 
with the face of the unit.
FP1775
nailing flanges
3/07  djt
3"
(76 mm) Min.
3"
(76 mm) Min.
1���"
(38 mm) 
Max. Hearth Height
FP1775
Fig. 5   Nailing flanges.
Bend 
Line
Valve Box 
Assembly