Netgear FS726TP 하드웨어 매뉴얼

다운로드
페이지 19
Page 13 of 19 
 
 
Figure 4-1. Attaching Mounting Brackets
  
 
Step 3: Checking the Installation 
Before you apply power: 
 
o
 
Inspect the equipment thoroughly.  
o
 
Verify that all cables are installed correctly.  
o
 
Check cable routing to make sure cables are not damaged or creating a safety hazard.  
o
 
Be sure all equipment is mounted properly and securely.  
 
Step 4: Connecting Devices to the Switch 
The following procedure describes how to connect devices to the switch’s RJ-45 ports. Your NETGEAR ProSafe FS726TP Smart Switch with PoE 
contains Auto Uplink™ technology, which allows you to attach devices using either straight-through or crossover cables. 
 
 
Figure 4-2. Connecting Devices to the Switch
 
Connect each device to an RJ-45 network port on the switch’s front panel (see Figure 4-4). Use Category 5 (Cat5) unshielded twisted-pair (UTP) 
cable terminated with an RJ-45 connector to make these connections. 
Note: Ethernet specifications limit the cable length between the switch and the attached device to 100 m (328 ft). 
 
Step 5: Installing an SFP GBIC Module 
The following procedure describes how to install an SFP Gigabit Ethernet module in the switch’s Gigabit module bay. Standard SFP GBIC modules 
are sold separately from the FS726TP. If you do not want to install an SFP GBIC module at this time, skip this procedure.   
 
To install an SFP GBIC module: 
 
o
 
Insert the SFP module into the SFP module bay.  Press firmly to ensure the module seats into the connector.