Netgear FS726TP 하드웨어 매뉴얼

다운로드
페이지 19
Page 14 of 19 
 
 
Figure 4-3. Installing a Gigabit Ethernet Module into FS726TP
 
 
 
Step 6: Applying AC Power 
NETGEAR ProSafe FS726TP Smart Switch with PoE does not have an ON/OFF switch; the only method of applying or removing AC power is by 
connecting or disconnecting the power cord. Before you connect the power cord, select an AC outlet that is not controlled by a wall switch, which 
can turn off power to the switch. After you select an appropriate outlet, use the following procedure to apply AC power. 
Connect the female end of the supplied AC power adapter cable to the power receptacle on the back of the switch. 
Connect the 3-pronged end of the AC power adapter cable to a grounded 3-pronged AC outlet.  
When you apply power, the Power LED on the switch’s front panel will be Green. 
 
If the Power LED does not go on, check that the power cable is plugged in correctly and that the power source is good. If this does not resolve the 
problem, refer to Appendix B, Troubleshooting. 
 
 
 
Step 7:  Switch Management through a Web Browser or the PC Utility for Initial Configuration 
Your NETGEAR ProSafe FS726TP Smart Switch with PoE contains software for viewing, changing, and monitoring the way it works. This 
management software is not required for the switch to work.  You can use the ports without using the management software.  However, the 
management software can let you setup VLAN and Trunking features and also improve the efficiency of the switch and, as a result, improve its 
overall performance as well as the performance of your network.  
 
After you power-up the switch for the first time, you can configure it using a Web browser or a utility program called Smart Wizard Discovery. For 
more information about managing the switch, see the Software Manual on the Smart Switch Resource CD