INSTEON 2486dxxx 사용자 설명서

다운로드
페이지 24
Page 5 of 24        
                                                                                                           Rev: 1/21/2014 7:36 AM 
Installation – Circuit with 1 Switch 
1) 
At electrical panel, turn off circuit breaker(s) and/or remove fuse(s) feeding wall box. Verify that the 
power is off before continuing. 
2) 
Remove wallplate from the switch. Unscrew switch and gently pull out. 
3) 
Disconnect wires from switch.
  
4) 
Turn on power. 
5) 
Use a voltage meter to identify the Line and Load 
wires connected to the switch. 
6) 
Identify Neutral and Ground wires. 
7) 
Turn off power. 
8) 
Connect wires as per table/diagram (confirm firm 
attachment with no exposed wire) 
9) 
With button labels right-side up, gently place 
KeypadLinc into wall box and screw into place. 
10)  Turn on power.  
KeypadLinc’s ON button and connected light 
will turn on. 
11)  Verify KeypadLinc is working properly by tapping 
ON and OFF on a 6-button KeypadLinc or MAIN 
On/Off on a 8-button KeypadLinc. 
KeypadLinc’s button LED and connected load will turn on and off. 
12)  Reinstall the wallplate. 
 
 
 
 
 
 
 
 
 
                                                      
1
 
If the wires cannot be detached by unscrewing them, cut the wires where they enter the switch, then strip ½” of insulation off the ends.
 
KeypadLinc Wire 
Wall Box Wires 
Bare copper 
Ground 
(commonly bare 
copper, green wire or 
green screw) 
White 
Neutral 
(commonly white) 
Red 
Load  
(light, fan, etc.) 
Black 
Line 
(120V to Ground)