RadioFrame Networks Inc MCSERIESHP10 사용자 설명서

다운로드
페이지 131
MC-Series High-Power System 
 
Installation 
998--01 Rev X1 
RadioFrame Networks, Inc. 
CONFIDENTIAL AND PROPRIETARY 47 
 
 
For complete cabling information, refer to Appendix C “High-Power iDEN Microcell Rack 
Stack-Up, 3-Sector (Default) Configuration”. 
4.3.3  CSU 
1  Remove the cabinet mounting rails from the CSU mounting location. 
2  While supporting the CSU, slide the CSU into the cabinet mounting position. 
3  Mount the CSU in the location shown in the cabinet illustration earlier in this 
section. As necessary, follow the equipment manufacturer's installation procedure 
for mounting the CSU in a 19” standard EIA-compliant rack. 
4  Connect the RFN-provided ground cable (P/N 820-0609-10; CSU to GND BAR) 
between the cabinet ground bar and the grounding lug on the rear of the CSU, and 
ensure the connection is tight.  
5  Connect the RFN-provided power cable (P/N 820-0615-50; CSU to PDU-CSU) to 
the CSU power. 
6  Connect the other end of the power cable to the circuit breaker on the PDU.  
7  Connect the CSU to each iSC-3 according to Sprint Nextel’s installation procedure. 
8  Using a cat-5 cable, connect 10/100 Ethernet port 1 on the CSU to port 8 on the 
BIC ERTM for remote-management access. 
For complete cabling information, refer to Appendix C “High-Power iDEN Microcell Rack 
Stack-Up, 3-Sector (Default) Configuration”. 
4.4  Mounting Auxiliary Equipment 
Follow Sprint Nextel's procedures for mounting the following auxiliary equipment:   
• Powerplant 
• Backboard 
• Surge arrestors 
• Alarm blocks 
• Environmental sensors 
4.5  Cabinet-to-Site Cabling 
Follow Sprint Nextel's procedures for installing the following wiring at the site, and then 
complete the procedures in this section to complete the cabinet-to-site cabling. See 
Appendix C for top of the rack connections. 
• Grounding 
• T1 
• GPS surge arrestors 
•  EAS alarm cabling 
 
Warning! 
Always connect the power cable to the CSU before connecting the power cable 
to the PDU.