RadioFrame Networks Inc RFU7 사용자 설명서

다운로드
페이지 50
Installing the RadioFrame System 
 
16 
•  If the mounting holes do not line up, adjust the ACU up or down until the 
mounting holes line up. 
 
Caution 
Do not block the air vents on the sides or rear of the ACU. 
Plug the ACU into an approved power source (for more information refer to 
“Hardware Specifications”). 
Verify that the ACU is receiving power and that each ACU card is operational. 
Each card installed in the front and back of the ACU has two LEDs: Power and 
Status. All LEDs should light green. If any LEDs do not light or are red, refer to 
“Troubleshooting.” 
 
Figure 8 
Mount the ACU only in an EIA-standard compliant 19” rack.