Karlnet Inc. KS-CPO010124B 사용자 설명서

다운로드
페이지 20
 
525 Metro Place North, Suite 100 
Dublin, OH  43017 
KarlNet
Office:  614-822-5275  
Fax:      614-822-0024 
www.karlnet.com 
 
 
 
 
 
 
   
    
    
INSTALLATION   
 
Follow the steps below to install your KarlNet CPE Outdoor wireless device: 
1. 
   
2. 
 
3. 
  
4. 
 
Each step is described in more detail below. 
Mount the Unit 
 
Each SSU or CSU unit ships with a mounting bracket and associated hardware that can 
be used to mount the unit on a pole.  The bracket should be used on poles that support 
standard U-mounts (2.5” in diameter).  You can use other mounting brackets at your own 
discretion. 
 
General Mounting Considerations 
 
 Mount the SSU or CSU to a secured pole in the shade, with unobstructed line of 
sight to the Wireless Base Station (WBS).   
 Stainless steel hose-clamps, or any suitable equivalent, may be used to secure the 
unit to the mast.     
 Leave the unit mounting loose enough to allow for movement when performing 
the alignment/testing procedure.  The unit should be tightened only after the 
alignment/testing procedure is completed.   
Power up the Unit 
 
Power for the SSU/CSU is provided either through a Teletronics PoE Injector (or another 
approved PoE injector) or through a Jameco 14V DC power wall-wart (or another 
approved DC power supply).  The SSU/CSU ships with both a PoE injector and DC 
power supply.  
 
9