Telephonics Wireless Corporation 8504HI0001000 사용자 설명서

다운로드
페이지 28
 
 
Figure 13.  System Parameters Dialog Box 
h. 
i. 
Verify the information is correct. 
Verify the license information is correct. 
  
5.4  Field Acceptance Test 
The following tests are conducted to ensure the functionality of the nanoCell.  Table 5-1 is used 
to identify the tests needed and serves as a checklist for documenting their completion. 
 
Table 5-1.  Field Acceptance Tests 
Item Test 
Description  Pass/Fail
Configuration using LMT 
 
 
Establish Configuration 
1 nBTS radio, 4 nMS radios in service 
 
3 Provisioning 
 
 
4 License 
activation 
 
 
Basic GSM Call Fuctionality 
 
 
Perform 10 successful camps 
Done after power cycles. 
 
7 Location 
Update 
 
 
MS to MS Calls 
 
 
 
Telephonics Wireless Corporation, Proprietary and Confidential 
Copyright © 2002,2003 Telephonics Wireless Corporation.  All rights reserved
 
20