Nokia Solutions and Networks T5DK1 사용자 설명서

다운로드
페이지 140
BTS 120 Degree Sector (3 Sector) Receive Path Cabling
68P64115A19
4
Mar 2003
1X SC 4812T-MC BTS Hardware Installation - Software Release R2.16.1.x
CONTROLLED INTRODUCTION
2-39
Cabling Procedure
Table 2-31: Installing the 120 Degree Sector Receive Path Cables
Step
Action
1
Attach the connector-equipped end of the cables to the BTS RX connectors.
2
Route the cables to the lightning arrestors.
3
Cut the cables to length and label them accordingly.  Install connectors on the cables, and attach the
cables to the lightning arrestors.
2