Nova-243 Outdoor LTE TDD Base Station Installation Guide
6
2. Installation Preparation
Supporting Materials
2.1
Prepare the following support materials accordingly, as given in Table 2-1.
Table 2-1 Support Materials
Item
Description
Power cable
< AWG16 e.g. AWG14
Shorter than 100m
Power plug
The power plug connecting to the electricity supply.
Antenna RF cable
50 ohm feeder
Ethernet cable
Outdoor CAT6
Shorter than 100m
Antenna
Omnidirectional, or directional antenna
Ground cable
16mm² yellow-green wire
Installation Tools
2.2
The following tools are needed during the installation.
Level bar
Marking pen
Knife
Vise
Wrench
Percussion drill and
some drill heads
hammer
Cross
screwdriver
Cable vise
Tape measure
5mm L-shape allen
wrench
Ladder