Nova-436 Outdoor LTE TDD Base Station Installation Guide 
15 
 
 
Install on Wall 
3.5
The wall must bear four times of the base station weight. 
1.  Take apart the assembled installation bracket kit to get the installation bracket 
2.  Fit the installation bracket on the wall, and mark the drilling locations. 
 
 
Caution: 
The arrow of the installation bracket must be upward. 
3.  Drill two 10mm diameter and 70mm depth holes in the wall by following the 
marked locations. 
4.  Check the up/down direction of the installation rack, and then fi x base station 
to the wall using M8*80 expansion screws.   
5.  Refer to the installation steps on pole, fix base station on wall. 
 
Connect Cable 
3.6
3.6.1  Requirement for Cable Laying 
General requirements: 
 
Bending radius requirement of feeder cable: 7/8
” > 250mm, 4/5” > 380mm   
 
Bending radius requirement of jumper cable: 1/
4” > 35mm,1/2” (super soft) > 50mm,
1/2
” (ordinary)>127mm 
 
Bending  radius  requirement  of  power  cable  and  grounding  cable:  >  tripled  of  the 
diameter of cable 
 
The  minimum  bend  radius  of  the  optical  fiber  is  the  20  times  of  the  diameter  of 
optical fiber. 
 
Binding the cables according the type of the cable, the intertwining and crossing is