Baicells Technologies Co. Ltd. MBS2130 사용자 설명서

다운로드
페이지 27
Nova-436 Outdoor LTE TDD Base Station Installation Guide 
16 
 
forbidden. 
 
The label should be paste after the cable laying. 
Optical fiber laying requirement: 
 
The circling and twisting is forbidden during the laying. 
 
The binding on the turning is forbidden. 
 
The pulling and weigh down the optical fiber is forbidden. 
 
The redundant optical fiber must enwind the dedicated device. 
Grounding laying requirement: 
 
The grounding cable must connect to the grounding point. 
 
The grounding cable must be  separate with the signal cables, remaining a certain 
distance to avoid the interruption of signal. 
3.6.2  Connect GPS Antenna 
1.  Insert GPS jumper into cold shrink tube. 
2.  Connect one end of the GPS jumper to the GPS antenna.   
3.  Push the cold shrink tube to the top joint and pull out the strip. 
4. 
Connect  the  other  end  of  the  GPS  jumper  to  GPS  interface  of  the  base  station, 
which also need weatherproof protection.
 
3.6.3  Connect RF Cable 
1.  Open the dust cap of ANT0ANT1ANT2, and ANT3 interface. 
2.  Insert RF cables into cold shrink tube. 
3.  Connect one end of the two RF cables to ANT0ANT1ANT2, and ANT3 interface 
of the base station and tighten them with wrench. 
4.  Push the cold shrink tube to the top joint and pull out the strip. 
5.  Connect the other end of the RF cables to the external antennas, which also need 
weatherproof protection. 
3.6.4  Connect Optical Fiber 
1.  Unscrew three screws on the cover of wiring cavity using M4 cross screwdriver and 
open the wiring cavity.