HP GRACO OR PRO TI1681A 사용자 설명서

다운로드
페이지 70
Operation
309293J
19
Operation
Operating Checklist
Check the following list daily, before starting to operate the system, to help ensure you of safe, efficient operation.
All operators are properly trained to safely 
operate an electrostatic waterborne air spray 
system as instructed in this manual.
All operators are trained in the Pressure 
Relief Procedure
 
on page 20.
The electrostatics are turned off and properly 
grounded according to the.Fluid Voltage Dis-
charge and Grounding Procedure 
on page 
20 before any person enters the safety enclo-
sure, before cleaning, and before performing 
any maintenance or repair.
The system is thoroughly grounded and the 
operator and all persons entering the spray 
area are properly grounded. SeGrounding 
on page 17.
Fluid Hose is in good condition with no cuts or 
abrasions of the PTFE layer. Replace hose if 
damaged.
Ventilation fans are operating properly.
Workpiece hangers are clean and grounded.
All debris, including flammable fluids and rags, 
is removed from the spray area.
Only fluids with a flash point above 140
°
(60
°
C) and a maximum organic solvent con-
centration of 20%, by weight, may be in the 
spray area.
All conductive objects in the spray area are 
electrically grounded and the floor of the spray 
area is electrically conductive and grounded.