Hughes AN4-074-DF Manual Do Utilizador

Página de 72
Chapter 4 • Cabling and connections
 
32
1035567-0001  Revision A
Routing the cables at 
the ODU
Route the coaxial transmit and receive cables at the ODU as 
follows:
1. Route the transmit cable (marked with blue electrical tape) to 
the back of the transmitter in a configuration similar to that 
shown in Figure 30. 
2. Route the receive cable (marked with red electrical tape) up 
the mast, behind the reflector, and through the feed arm to the 
LNB to achieve a configuration similar to that shown in 
Figure 30.
Figure 30:  Transmit and receive cable configurations
T0145004
Transmitter
Transmit cable
(marked with
BLUE tape)
Receive cable
(marked with
RED tape)
Receive cable
passes through
feed arm.
LNB