Lucent Technologies Release 7 Manual Do Utilizador

Página de 2657
DEFINITY Enterprise Communications Server Release 7 
Maintenance for R7r  
555-230-126  
Issue 4
June 1999
Maintenance Object Repair Procedures 
9-729
DUP-CHL (Duplication Interface) 
9
Replace the cable observing proper connector location and orientation.
5. Apply power to the standby SPE carrier.
6. Verify that the standby is up. Regular flashing of the yellow LED on the 
Processor circuit pack indicates that the standby SPE is up and cycling. If 
the yellow LED is not flashing after 5 minutes test the standby SPE by 
using the lock-and-power-down procedure described in Chapter 5.
7. With the standby SPE still busied out to prevent an interchange, unlock the 
active SPE by moving the SPE Select Switches back to the Auto position.
8. Use the status spe command to verify that handshake is up. Wait up to 10 
minutes for handshake to come up.
9. If the status shows MAJOR alarms, use the display alarms command for 
category spe. Resolve alarms for maintenance objects other than DUPINT 
and DUP-CHL first.
10. Execute the test duplication-interface long clear command to resolve 
the DUPINT and DUP-CHL alarms. If any tests abort, but no tests fail, run 
the test again at 1-minute intervals up to a maximum of 5 times with the 
goal of observing all tests passing.
If no DUPINT nor DUP-CHL tests fail, the DUPINT and DUP-CHL 
alarms are resolved or cleared in this active to standby direction. 
Continue with step 11.
You should by now have replaced both DUPINT circuit packs and 
the interconnecting cable.
11. Release the standby SPE from the busyout condition using the release 
spe-standby command and wait (about 10 minutes) for the standby SPE 
to be refreshed as observed with the status spe command.