InRow RC Installation
3. Slightly open the top coil vent.
4. At the water supply, open the 
appropriate valves to begin letting 
water slowly enter the equipment.
5. At the equipment, close the top coil 
vent when water begins slowly 
flowing out of the vent.
6. At the water supply:
a. Open all valves (no greater 
than 76 l/m [20 gpm]), 
allowing the water supply to 
reach the highest possible flow 
to the equipment for 45 seconds.
b. Close the valves to a 3.8–11.4 l/m (1–3 GPM) flow for 60 seconds.
c. Open the valves to maximum flow for another 45 seconds.
d. Balance the system to provide the designed flow rate to all equipment.
na
17
68a
Top coil