APC ACRC103 Manual Do Utilizador
21
InRow RC Installation
3. Slightly open the top coil vent.
4. At the water supply, open the
4. At the water supply, open the
appropriate valves to begin letting
water slowly enter the equipment.
water slowly enter the equipment.
5. At the equipment, close the top coil
vent when water begins slowly
flowing out of the vent.
flowing out of the vent.
6. At the water supply:
a. Open all valves (no greater
than 76 l/m [20 gpm]),
allowing the water supply to
reach the highest possible flow
to the equipment for 45 seconds.
allowing the water supply to
reach the highest possible flow
to the equipment for 45 seconds.
b. Close the valves to a 3.8–11.4 l/m (1–3 GPM) flow for 60 seconds.
c. Open the valves to maximum flow for another 45 seconds.
d. Balance the system to provide the designed flow rate to all equipment.
c. Open the valves to maximum flow for another 45 seconds.
d. Balance the system to provide the designed flow rate to all equipment.
na
17
68a
Top coil
vent
vent