APC AP7900 Manual Do Utilizador

Página de 186
®
USER’S GUIDE
Switched Rack PDU
42
Outlet Settings for Outlets and Outlet Groups
How to initiate a control action
Web interface. 
To control the outlets on your Switched Rack PDU
1. Select 
Outlets
, and then 
Control
 on the navigation menu.
2. Mark the check-boxes for each individual outlet or outlet group to 
control, or select the 
All
 
Outlets
 check-box.
3. Select a 
Control Action
 from the list, and click 
Next >>
. On the 
confirmation page that explains the action, choose to execute or cancel it.
Control Console. 
Select 
Outlet Control/Configuration 
from the
 Device 
Manager
 menu to display a list of outlets. For each outlet, the list indicates 
whether it is a member of an outlet group.
1. Choose either or the following:
– To control one outlet and the outlet group, if any, to which it belongs, 
select the number of the outlet, and then select 
Control Outlet
.
– To control all outlets, select 
Master Control/Configuration
, and 
then 
Control of ALL Outlets
.
2. Select a control action.
3. On the confirmation screen that describes the action to be executed, 
type 
Yes 
at the prompt to perform the action.
If you apply an outlet control action to outlets or outlet groups, the 
following delays are used for the action:
• For an individual outlet (not in an outlet group), the action uses 
the delay periods and reboot duration configured for that outlet.
• For a global outlet group, the action uses the delay periods 
and reboot duration configured for the global outlet.
• For a local outlet group, the action uses the delay periods 
configured for the lowest-numbered outlet in the group.