Agilent Technologies 85225F Manual Do Utilizador

Página de 148
66
Installation and User’s Guide
2
Installing the System
 
To unpack the shipment crate containing the rack cabinet
The racked system is shipped upright secured to a pallet. Other system 
components are shipped separately. Follow these instructions to unpack 
and inspect the rack cabinet and the racked system components.
Required Tools
• 9/16 inch wrench or adjustable end wrench
• Prying tool to remove packaging clamps
WA R N I N G
Always wear safety glasses when removing the clamps and other 
packing materials from the crate.
C A U T I O N
Be careful not to bend the clamps while removing them from the 
shipping crate. You may reuse the clamps when the system is 
repacked.
To unpack the shipment crate containing the rack cabinet
Step
Action
Notes
Remove the outer packing 
crate.
Remove the clamps holding the packing 
crate top cover in place.
Remove the top cover and set it aside.
Remove the clamps holding the first 
packing crate wall in place. 
Insure that two other people are available 
to hold the last two walls in place as the 
last set of clamps is removed.
Remove the other walls.
f
Set the loading ramp panel aside for now.
Which wall is removed first does not 
matter.
In double-rack crates, the heaviest wall 
is the loading ramp. In single-rack 
crates, the loading ramp is shipped 
inside the crate, placed on top of the 
rack (it is a hinged assembly, shipped in 
the folded position).
Remove the packaging 
materials.
Remove the foam top cover.
Remove the plastic wrapping from the 
system.