Installation and User’s Guide
2
Installing the System
 
To prepare the installation site
Follow these steps to prepare the site for system installation.
C A U T I O N
This product is designed for indoor use in Installation Category II 
and Pollution Degree 2 per IEC 61010-1 and 664 respectively. 
To prepare the installation site
Step
Notes
Ensure that your installation site meets the 
environmental requirements.
Environmental requirements (temperature, 
relative humidity, altitude, and clearance) are 
listed in 
Ensure that your installation site meets the 
electrical requirements.
Electrical requirements are listed in 
Table 16 Environmental Requirements
Environmental Parameter
System Requirement
Temperature
+0
°
C to +45
°
C (+32
°
F to +113
°
F)
* †
* Install air conditioning and heating as needed to achieve the required ambient temperature range
.
† Accuracy-enhanced measurement performance is specified at an ambient temperature range of 
+25
°
C ±5
°
C. After calibration, hold the ambient temperature of the measurement environment to 
±1
°
C of the ambient temperature at the time of calibration.
Relative humidity
Maximum 80% for temperatures up to 31
°
decreasing linearly to 50% at 40
°
C
Altitude
Up to 3000 meters (approximately 10000 feet)
Clearance (behind and above rack)
‡ Required to ensure the extractor fans can properly ventilate the system.
15 centimeters (6 inches) minimum
Table 17 Electrical Requirements
Electrical Parameter
System Requirement
Supply capability
100/120 volts, 2000 VA 
200/240 volts, 2000 VA
Circuit sharing
Do not connect air conditioning or 
motor-operated equipment to the same ac 
circuit supplying line voltage to the system.