Bizfon 680 Guia Do Utilizador
Appendix A Professional Installation Guide
Bizfon Owner’s Guide
77
9. Press
to configure Unit 1.
10. Press the blue button on Unit 1 when prompted.
The announcement now tells you the new status of the clus-
ter
ter
11. Press the keypad number associated with the number of the
next unit you want to add to the cluster.
12. Press the blue button on the next unit when prompted.
13. Repeat steps 11 and 12 until you have configured the entire
cluster.
14. Press
when prompted.
15. Connect the expansion cables.
Each expansion cable connects from the OUT port of one
unit to the IN port of the next unit.
unit to the IN port of the next unit.
After you press
, you have approximately thirty seconds to
connect the expansion cables before the Bizfon automatically
reboots.
reboots.
If the reboot begins before you have connected the expansion
cables, continue to connect the cables. The units will reboot
again.
cables, continue to connect the cables. The units will reboot
again.
To confirm the status of each unit, press the blue button on each
expansion unit (2, 3, or 4). Do not press the button on unit 1 yet.
expansion unit (2, 3, or 4). Do not press the button on unit 1 yet.
Running Diagnostics
Pressing the blue button on unit 1 runs the diagnostics on every
unit. The diagnostics verifies that everything is working prop-
erly and ensures that you get the best performance from you
Bizfon 680s.
unit. The diagnostics verifies that everything is working prop-
erly and ensures that you get the best performance from you
Bizfon 680s.
NOTE: You cannot use the Bizfon 680 for calls during diag-
nostics.