Cisco Cisco UCS B260 M4 Blade Server Ficha De Dados
Cisco UCS B460 M4 Blade Server (with Intel® Xeon E7 v2 CPU)
SUPPLEMENTAL MATERIAL
53
In
, two ports from the VIC 1340/1240 are channeled to Fabric Extender A and two are channeled
to Fabric Extender B. Adapter slot 2 is empty. The VIC 1380/1280 installed in adapter slot 3 channels four
ports to each of the Fabric Extenders. The result is 60 Gb of bandwidth to each Fabric Extender.
ports to each of the Fabric Extenders. The result is 60 Gb of bandwidth to each Fabric Extender.
Figure 12
VIC 1340/1240 and VIC 1380/1280 (adapter slot 2 empty)
In
, no VIC 1340/1240 is installed. A Cisco UCS Storage Accelerator adapter is installed in slot 2,
but provides no network connectivity. The VIC 1380/1280 installed in adapter slot 3 channels four ports to
each of the Fabric Extenders. The result is 40 Gb of bandwidth to each Fabric Extender.
each of the Fabric Extenders. The result is 40 Gb of bandwidth to each Fabric Extender.
Figure 13
No VIC 1340/1240 installed, UCS Storage Accelerator in slot 2 and VIC 1380/1280 in slot 3