In 
, two ports from the VIC 1340/1240 are channeled to Fabric Extender A and two are channeled 
to Fabric Extender B. Adapter slot 2 is empty. The VIC 1380/1280 installed in adapter slot 3 channels four 
ports to each of the Fabric Extenders. The result is 60 Gb of bandwidth to each Fabric Extender.
Figure 12
  VIC 1340/1240 and VIC 1380/1280 (adapter slot 2 empty)
In 
, no VIC 1340/1240 is installed. A Cisco UCS Storage Accelerator adapter is installed in slot 2, 
but provides no network connectivity. The VIC 1380/1280 installed in adapter slot 3 channels four ports to 
each of the Fabric Extenders. The result is 40 Gb of bandwidth to each Fabric Extender.
Figure 13
  No VIC 1340/1240 installed, UCS Storage Accelerator in slot 2 and VIC 1380/1280 in slot 3