Cisco Cisco Unified Contact Center Enterprise 9.0(1) Guia Da Instalação
•
Example 1: Run "RegUtil -export c:\temp” on machine setcon.
In the above example, a file called RegUtil_setcon.dat will be created in C:\temp.
•
Example 2: Run "RegUtil -export" on machine setcon from directory c:\test.
In the above example, a file called RegUtil_setcon.dat will be created in C:\test.
Note: The target folder must have write access. Therefore, the install media on a DVD cannot
be selected.
be selected.
Also, each time RegUtil is run with the export option, if there is already an existing
RegUtil_<hostname>.dat file, it will rename that file to RegUtil_<hostname>.dat.bak<number>.
So, in the above examples, it will create RegUtil_setcon.dat.bak1 if run a second time and
RegUtil_setcon.dat.bak2 if run a third time, and so on.
RegUtil_<hostname>.dat file, it will rename that file to RegUtil_<hostname>.dat.bak<number>.
So, in the above examples, it will create RegUtil_setcon.dat.bak1 if run a second time and
RegUtil_setcon.dat.bak2 if run a third time, and so on.
Technology Refresh example 1: production HDS/Administration & Data Server upgraded in parallel with the Central
Controller
Controller
In the first example, the production HDS/Administration & Data Server is upgraded in parallel
with the central controller. If necessary, a Unified ICM/Contact Center 9.0(1) temporary
HDS/Administration & Data Server is configured before the central controller upgrade
maintenance window to enable real-time reporting and configuration during the time that the
production HDS/Administration & Data Server is off-line.
with the central controller. If necessary, a Unified ICM/Contact Center 9.0(1) temporary
HDS/Administration & Data Server is configured before the central controller upgrade
maintenance window to enable real-time reporting and configuration during the time that the
production HDS/Administration & Data Server is off-line.
Table 1: How to perform a Technology Refresh upgrade where the production HDS/Administration & Data Server is upgraded
in parallel with the Central Controller Upgrade Maintenance Window
in parallel with the Central Controller Upgrade Maintenance Window
Comments
Reference
Action
Time Estimate
Step
None.
Upgrade the production
system to the required
baseline.
system to the required
baseline.
None.
1
No impact on the production
system.
system.
Create the Active Directory
environment.
environment.
None.
2
No impact on the production
system.
system.
Set up the new hardware.
None.
3
Required to enable configuration
and real-time reporting while the
and real-time reporting while the
Set up a temporary 9.0(1)
Administration & Data
Server.
Administration & Data
Server.
1 hour
4
Administration & Data Server is
being upgraded.
being upgraded.
************
************
************
************
Start of
Central
Central
Upgrade Guide for Cisco Unified ICM/Contact Center Enterprise & Hosted Release 9.0(1)
74
Chapter 8: Upgrade procedures
Technology Refresh upgrade examples