5 POST-INSTALLATION INSPECTION
Verify the following before proceeding with power-up of the system:
a. The cabinet or rack has been installed and grounded per the Site Grounding and Lightning Protection
Guidelines Manual, AE/LZT 123 4618/1.
b. All safety ground connections are:
i. Properly crimped.
ii. Connected to the proper connection points on the equipment.
iii. Connected to the ground bus bar using gradual bends in an upward fashion.
iv. Nut and/or bolts securing the ground lugs are sufficiently tightened.
c. All AC power cables have been labeled and installed per Section 4.5.
d. All rear panel control cable connections have been labeled and installed per Section 4.5
e. All modules have been installed per Section 4.6.
f. All front panel power switches on the PSU units have been set to the Off position.
g. All front panel RF antenna connections are labeled and installed per Section 4.7.
h. Verify all receive and transmit antenna ports are connected to 50 ohm load resistors of sufficient
power rating.
CAUTION
To prevent unintentional or malicious interference to other radio systems, the receive
and transmit antenna ports of all new installations should first be connected to 50 ohm
load resistors of sufficient power rating until the system is programmed to the proper
operating frequencies and ready to be deployed.
and transmit antenna ports of all new installations should first be connected to 50 ohm
load resistors of sufficient power rating until the system is programmed to the proper
operating frequencies and ready to be deployed.