DBS3900 LampSite 
Installation Guide 
7 Installing a pRRU3901 
 
Issue 08 (2016-05-30) 
Huawei Proprietary and Confidential         
Copyright © Huawei Technologies Co., Ltd. 
106 
 
Figure 7-42
 Installing jumpers between the pRRU3901 and external antennas 
 
 
----End 
Follow-up Procedure 
1. 
Route the cable, and then use a cable tie to bind the cable. For details, see 7.5.1 
Requirements for Cable Layout. 
2. 
Label the installed cable. For details, see section 15.4 Attaching an L-Shaped Label. 
7.6 Checking the pRRU3901 Hardware Installation 
pRRU3901 hardware installation checking includes hardware and cable installation checking. 
Table 7-9 lists the hardware installation checking items. 
Table 7-9
 Hardware installation checking list 
No. 
Item 
Ensure that the pRRU3901 is not grouned. 
The position for each device conforms to the engineering design and meets the 
space requirement.   
Ensure that the pRRU3901 is properly installed. 
The surface of the pRRU3901 is neat and clean. The external paint is intact. 
The labels, tags, and nameplates are correct, legible, and complete. 
 
Table 7-10 lists the check items of the signal cable connection. 
Table 7-10
 Checklist for the signal cable connection 
No. 
Item