DBS3900 LampSite 
Installation Guide 
7 Installing a pRRU3901 
 
Issue 08 (2016-05-30) 
Huawei Proprietary and Confidential         
Copyright © Huawei Technologies Co., Ltd. 
107 
 
No. 
Item 
The connectors of the signal cables must securely connected. 
The connectors of the signal cables are intact. 
The signal cables are intact. 
The cable ties are evenly spaced. The signal cables are bound neatly with cable 
ties to proper tightness, and arranged at even intervals in the same direction. 
The extra length of the cable ties is cut and removed. The cut surfaces of the 
indoor cables are smooth and have no sharp edges. 
The cable layout facilitates maintenance and expansion. 
Correct and clear labels are attached to both ends of the signal cables. 
 
Table 7-11 lists the checking items for other cable connections. 
Table 7-11
 Checklist for other cable connections 
No. 
Item 
The connectors of the other cables must securely connected. 
Labels on the cables are legible and bound based on the engineering 
requirements. The cables must be bound tightly and neatly. The sheaths of the 
cables must not be damaged. 
Positions for routing the cables must meet requirements of the engineering 
design. 
 
7.7 Powering on the pRRU3901 
This section describes the power-on check on the pRRU3901 after the pRRU3901 hardware is 
installed and checked.   
Context 
After the RHUB and pRRUs are installed and connected to each other, power on them no 
matter whether the BBU is installed. 
Procedure 
Step 1  Power on the pRRU3901. Wait 3 to 5 minutes, check the status of the RUN indicator on the 
pRRU3901. 
If the RUN Indicator... 
Because... 
Then... 
Steady on 
There is power input, but the 
Power off the power supply,