Tait International Limited TBCK4B Manual Do Utilizador

Página de 132
DRAFT 4 
14
Description
TB9400 Installation and Operation Manual
© Tait Electronics Limited September 2011
1.3
Mechanical Assembly
This section illustrates the main mechanical components of the 
base station
 below shows the configuration for a typical dual 50 W 
base 
station
. The PMU occupies the slot at the left end of the subrack, with the 
reciter and PA pairs to the right of it. Each PA is mounted vertically with its 
heatsink facing its associated reciter. The PMU and each reciter/PA pair 
have their own cooling fans.
The front panel can be easily removed from the subrack by undoing two 
quick-release fasteners. Refer to 
details.
.
Figure 1.1
Mechanical assembly - dual 50 W 
base station
 with front panel
b
front panel
i
reciter 1
c
subrack
j
module retaining clamp
d
PMU
1)
subrack interconnect board
e
PA 2
1!
plastic guide rail
f
reciter 2
1@
subrack interconnect board retaining clamp
g
cable retaining clip
1#
front panel fastener
h
PA 1
b
c
d
e
f
g
h
i
j
1)
1!
1@
1#