Tait International Limited TBCK4B Manual Do Utilizador
DRAFT 4
80
Installation
TB9400 Installation and Operation Manual
© Tait Electronics Limited September 2011
5.6
Connecting Up the
Base Station
This section provides information relevant to the task of connecting up the
various inputs and outputs of the
various inputs and outputs of the
base station
.
5.6.1
Connection Overview
The connections at the rear of a dual 50 W
base station
are identified in
. External connections are all located at the rear of the subrack.
Figure 5.7
50 W
base station
inputs and outputs
b
serial RS-232 connector
a
h
+ VDC input
c
1 PPS input
i
auxiliary DC output
d
external reference frequency input
j
AC mains input
e
RF input
1)
Ethernet interface connector
f
RF output
1!
subrack ground connector
g
– VDC input
1@
system interface connector
a. Factory use only.
PA 1
Reciter 1
PMU
b
c
d
e
f
g
h
i
j
1)
1!
1@
PA 2
Reciter 2