Location of cables/conductors in the proximity of the transponder (balise). 
 
2.5  Mounting of Transponder 
2.5.1 General 
The transponder shall always be programmed with a default telegram in its 
memory. The programming can be performed in connection to the installation or 
be performed in advance. 
If the transponder is programmed with the default telegram in advance, it must 
be checked with the documentation for the current installation that the right 
individual of transponder is prepared to be mounted on right place. Check also 
which mounting method should be used. 
 
 
SAFETY REQUIREMENT: 
The installation routines must either ensure that no trains allows to pass an 
information location that not are approved, or ensure that ATP is not in operation 
for the actual information location (construction area is set). 
Different types of crossties require different types of attachment for 
transponders. The attachments are designed in a way that metal parts cause 
insignificant attenuation of the transmission. The design makes the transponders 
lie at the same height relative to the head of the rail, regardless of which type of 
attachment that is used for mounting. 
It is absolutely forbidden to change an existing attachment or to provide new 
designs without consulting Bombardier. 