Baicells Technologies Co. Ltd. MBS1105 Manual Do Utilizador

Página de 31
Baicells mBS1105 Base Station Installation Guide(V100R001C00,02).docx 
 
2. Out-of-Box Audit 
Before opening the box, make sure the package is in good condition, undamaged and 
not wet. During the unpacking, avoid potential damaging impacts from hits or excessive 
force. Once unpacked, check the contents to see if they are consistent with that in the 
shipping list shown in Table 2-1. 
Table 2-1 Shipping List 
Number 
Item 
Quantity 
Description 
mBS1105 base 
station 
Check whether the base station
’s tag 
is consistent with the requirement 
Power supply 
100V ~ 277V AC to 48V DC 
Power terminal 
2 wires green terminal 
GPS antenna and RF 
cable 
Installation bracket 
and its screws 
Omega 4 
Installation bracket 1 
M10*160 outer hex bolt 4 
M10 flat gasket 10 
M10 spring cushion 10 
M10 screw 10 
M8*80 expansion bolt 2 
eNodeB bracket and 
its screws 
eNodeB fixing bracket 1 
M6*16 hex combination screw 4 
GPS mounting 
bracket and its 
screws 
Fixed accessories of GPS 
M4*14 screw 2 
Ground terminal 
Used for making ground cable. 
All-weather electrical 
tape 
Installation accessories 
10 
Mastic tape 
Installation accessories 
11 
Warranty 
12 
Certification 
13 
User guide 
 
Note: 
During  the  unpacking,  if  the  outer  package  is  damaged  or  wet,  stop  unpacking  and  find  the  cause. 
Report the issue to the vendor. For any shortage or damage that is identified, report the local vendor 
within 10 days.