Monogram ZV800SJSS Instrução De Instalação

Página de 24
9
INSTALL FRAMING FOR HOOD
SUPPORT
IMPORTANT
— 
Framing must be capable of
supporting 100 lbs.
If drywall is present, mark the screw hole locations for
the top mounting brackets. Remove the template.
• Cut away enough drywall to expose 2 vertical studs at
the bracket location indicated on the template.
• Install a horizontal support at least 1” x 6” between 
two wall studs at the top bracket installation location.
The horizontal support must be flush with the room
side of the studs. 
Use cleats behind both sides of the
support to secure to wall studs.
• Reinstall drywall.
1
Centerline of 
Installation
Space
8" Min. Opening for Ductwork
View From Rear
Cleats
1" x 6" Min.
Mounting
Support
Installation Instructions
6” min. opening for ductwork
Centerline of
installation
space
View from rear
cleats
1” x 6” min.
mounting 
support
DUCTWORK, WIRING LOCATIONS
Determine the exact location of the vent hood.
• Locate the template packed with the literature.
– Measure 36” from the floor to the top of the cooking 
surface. Add hood installation height determined on 
page 7. Mark that location.
– Use a level to draw a straight pencil line on the wall. 
– Tape the template in position along the penciled 
line. CHECK TO BE SURE THE TEMPLATE IS LEVEL.
Ceiling ducting:
If ductwork will vent straight up to the ceiling:
• Use a level to draw a line straight up, from the centerline
on the template to the ceiling.
• Measure 3-3/4” from the back wall to the centerline of 
a 6-1/2” hole on the ceiling.
NOTE: If drywall is not present, add drywall thickness to
the 3-3/4” dimension.
Wall Ducting:
If ductwork will vent to the rear:
• Use a level to draw a line straight up from the centerline
on the template.
• Measure at least 3-3/4” above the top mounting bracket
holes shown on the template to the centerline of a 
6-1/2” dia. duct hole. (Hole may be elongated for 
duct elbow.)
HOUSE WIRING LOCATION:
• The junction box is located on the top right side of the
hood.
• Wiring should enter the back wall 20” to 26” above the
bottom of the hood, and within 4” of the right side of the
centerline. Wiring should enter at least 4” above the
bracket on the right side.
REAR WALL TEMPLATE
C
L
49-80271    JR 07-04
Drill 1/8"
Pilot Holes
Drill 1/8"
Pilot Holes
Drill 1/8"
Pilot Holes
Drill 1/8"
Pilot Holes
Drill 1/8"
Pilot Holes
Drill 1/8"
Pilot Holes
ALIGN BOTTOM EDGE WITH  
PENCIL LINE INDICATING  
BOTTOM OF THE HOOD.
5-1/16"
9-5/8"
8-1/8"
2-1/16"
13-3/4"
12-3/4"
Ceiling
3-3/4” centerline to wall
6-1/2” dia. hole
FOR CEILING VENT DUCTING
Centerline 3-3/4”
min. above top
mounting bracket
holes
FOR WALL VENT DUCT
WALL-MOUNTED INSTALLATION—VENTED TO THE OUTSIDE