2.  Start up and Adjustment Procedure 
2.1  Confirmation of Connections 
 
 
 
III-5 
2.  Start up and Adjustment Procedure 
 
2.1  Confirmation of Connections 
 
 
Refer to Connection Manual (BNP-B2183) to confirm the connection of each unit and communication 
terminals, etc. 
 
Especially confirm the position of the input power and connection connectors, etc. 
 
It is recommended to leave the servomotor and spindle motor drive lines disconnected until the settings of 
the parameters, etc., is completed. 
 
 
 
 
 
CAUTION
 
 
  
 
 
Ground the signal cables to ensure stable system operation. Also ground the control unit main 
frame, power distribution panel and machine to one point, so they all have the same potential. 
 
 
 
2.2  Setting of Various Switches 
 
 
1)  Control unit setting switch 
 
 
A slide switch (SW1) and rotary switches (CS1, CS2) are located in the window on the upper front of the 
control unit. 
 
 
Set SW1 to the "lower side" and CS1 to "0". CS2 is normally set to "0". Refer to the following settings if 
needed. 
 
 Switch 
 Operation 
 Application 
 
Normal operation mode 
Normal operation 
 
PLC program stop 
For PLC development work
 2  Not 
used 
 
 
Maintenance mode for maker 
Do not use. 
 4  Not 
used 
 
 
Maintenance mode for maker 
Do not use. 
 6  Not 
used 
 
 
The entire memory will be erased, so do not set this. Do not use. 
 
8~F 
Maintenance mode for maker 
Do not use. 
 
 
 
 
CAUTION
 
 
  
 
 
If the control unit's rotary switch is set to "7", all data in the NC will be erased and the system will not 
start up.